Process & Inspection

Process Summary
Core Process F / PROOF Inspection Detail
01

Raw material automatic supply device installed and moisture

• Raw material automatic feeding device (auto feeding) system construction
  Prevent drying by notification of raw material input
  Residual level sensor and alarm in dry hopper

• 2 Moisture Meters
  Moisture content inspection: Measurement of moisture content during import
  inspection and before molding raw materials

02

Secure the extrusion temperature controller and install the

• Prevent molding defects by securing mold temperature maintenance equipment
  Completed installation of warning lights for each extruder (13 units) of temperature controller

03

Molding condition alarm device and computerized

• Computerization of molding condition management
  Beep sound when molding condition is out of specification
  Installation of warning lights is completed to operate the sensor at cooling water temperature ± 5 ℃.
  Molding condition management: Operation details computer systemrecord (after February)

04

Independent inspection standard setting and inspection result

• Compliance with inspection procedures to prevent spills
  Inspecting 5EA appearance and dimensions by number of samples
  Dimensional inspection computerized registration management